Main and standby power supply to the Riyadh Metro Line 2 substation from two bulk supply points: 10 circuits and 144 km of 33 kV underground cable along a 55 km route, 44.5 km of fibre optics, 300 insulated joints, 82,000 m² of asphalt and 400 m of horizontal directional drilling.
- Client
- Saudi Electricity Company (SEC)
- Location
- Riyadh
- Status
- Completed
- Business
- Energy
Project Key Figures
01/04
10
Circuits
144km
Underground Cable Length
55km
Route Length
44.5km
Fiber-Optic Cable Length