Skip to main content
Energy

Replacement of Existing 110 Kv OHTL by 110 Kv U/G Cable in Front of Jabal Ohud, Madinah

Home / Projects / Replacement of Existing 110 Kv OHTL by 110 Kv U/G Cable in Front of Jabal Ohud, Madinah
Project Overview

Replacement of the existing 110 kV double-circuit overhead line with a double-circuit underground cable in front of Jabal Ohud in Madinah, covering design, supply, construction and commissioning.

Client
Saudi Electricity Company (SEC)
Location
Madinah
Status
Completed
Business
Energy
Project Key Figures
01/02
Operating Voltage 110 kV
01/02
Related Projects
Construction of 132/13.8 Kv Salahualdeen Substation #8219 in Riyadh Ongoing Energy Construction of 132/13.8 Kv Salahualdeen Substation #8219 in Riyadh Client: Saudi Electricity Company (SEC) Construction of a new 132/13.8kV indoor GIS type Substation, arranged in a double-bus-single breaker configuration in SALAH-ALDEEN  area Riyadh. The Scope of works includes associated works in remote end substation # 8088. The  substation shall be  equipped with Substation Automation System (SAS) and will be remotely controlled from the SEC Power Control Center (PCC) through  Telecommunication system and gateway View project Construction of Al-Nada 132/13.8 Kv Substation #8220 in Riyadh Completed Energy Construction of Al-Nada 132/13.8 Kv Substation #8220 in Riyadh Client: Saudi Electricity Company (SEC) Construction of a new 132/13.8kV indoor GIS type Substation, arranged in a double-bus-single breaker configuration in AL-NADA  area Riyadh. The Scope of works includes associated works in remote end substation # 9008. The  substation shall be  equipped   with Substation Automation System (SAS) and will be remotely controlled from the SEC Power Control Center (PCC) through a Telecommunication system and gateway View project Reinforcement  of Hutat Sudair  132/33Kv Substation #8502 in Hutat Sudair Completed Energy Reinforcement of Hutat Sudair 132/33Kv Substation #8502 in Hutat Sudair Client: Saudi Electricity Company (SEC)  Reinforcement the capacity at existing 132/33kV S/S#8502  by adding 3rd 100 MVA 132/33kV transformer, extending the  existing 33kV switchgear at section ‘B’ by adding two(2) 800A feeder panels, and also adding new section “C” to meet load growth requirements of the area View project Reliability Enhancement For SS's Of Taif East Governorate (TEG) Discrete Group In Taif Area-OHTL Completed Energy Reliability Enhancement For SS's Of Taif East Governorate (TEG) Discrete Group In Taif Area-OHTL Design, engineer, procure, supply, deliver, construct, install, test, commission, and put into service overhead transmission line works for enhancing reliability of Taif East Governorate substations, including integration with existing substations and associated systems. View project
View All Projects
Next Project Rehabilitation, Renovation and Upgrading of HV, MV and LV Power Systems and SCADA & Communication System in Jazan Seaport