Project Overview

Power supply to the Dammam Housing project through 14 circuits and 219 km of 115 kV underground cable along a 73 km route, with 42 km of fibre optics, 687 insulated joints, 99,000 m² of asphalt, 1,136 m of horizontal directional drilling and six kilometres of roadworks, including crossings beneath Aramco pipelines.

Client
Saudi Electricity Company (SEC)
Location
Dammam
Status
Completed
Business
Energy
Project Key Figures
01/04
14 Circuits
01/04
Project Album
Related Projects
Construction of 132/13.8 Kv Salahualdeen Substation #8219 in Riyadh Ongoing Energy Construction of 132/13.8 Kv Salahualdeen Substation #8219 in Riyadh Client: Saudi Electricity Company (SEC) Construction of a new 132/13.8kV indoor GIS type Substation, arranged in a double-bus-single breaker configuration in SALAH-ALDEEN  area Riyadh. The Scope of works includes associated works in remote end substation # 8088. The  substation shall be  equipped with Substation Automation System (SAS) and will be remotely controlled from the SEC Power Control Center (PCC) through  Telecommunication system and gateway View project Construction of 220/22/22 Kv Eastern Extensions Substation, 6th October City, Egypt Completed Energy Construction of 220/22/22 Kv Eastern Extensions Substation, 6th October City, Egypt 6th of October City, Egypt Client: New Urban Communities Authority (NUCA) Design, supply, construction, testing and commissioning of the 220/22/22 kV Eastern Extensions substation in 6th of October City, executed in joint venture with XD EGEMAC. View project Construction of Al-Nada 132/13.8 Kv Substation #8220 in Riyadh Completed Energy Construction of Al-Nada 132/13.8 Kv Substation #8220 in Riyadh Client: Saudi Electricity Company (SEC) Construction of a new 132/13.8kV indoor GIS type Substation, arranged in a double-bus-single breaker configuration in AL-NADA  area Riyadh. The Scope of works includes associated works in remote end substation # 9008. The  substation shall be  equipped   with Substation Automation System (SAS) and will be remotely controlled from the SEC Power Control Center (PCC) through a Telecommunication system and gateway View project Construction of Qassim 380 Kv OHTL Completed Energy Construction of Qassim 380 Kv OHTL Al-Qassim & Al-Zulfi Client: Saudi Electricity Company (SEC) Construction of 380 kV overhead transmission lines and their loop-in/loop-out connection between the Qassim, Sudair and Al-Zulfi substations, executed in two portions in a joint venture. View project
View All Projects
Next Project Interconnection of 380/110Kv Yanbu-3 SWCC BSP with 110Kv Yanbu & Badr Network