Interconnection of 380/110Kv Yanbu-3 SWCC BSP with 110Kv Yanbu & Badr Network

Home / Projects / Interconnection of 380/110Kv Yanbu-3 SWCC BSP with 110Kv Yanbu & Badr Network
Project Overview

Interconnection of the 380/110 kV Yanbu-3 desalination bulk supply point with the 110 kV Yanbu and Badr network, including design, supply, construction, protection-system modifications and commissioning.

Client
Saudi Electricity Company (SEC)
Location
Yanbu
Status
Completed
Business
Energy
Project Key Figures
01/02
Interconnection Voltage 380/110 kV