Skip to main content
Energy

Interconnection of 380/110Kv Yanbu-3 SWCC BSP with 110Kv Yanbu & Badr Network

Home / Projects / Interconnection of 380/110Kv Yanbu-3 SWCC BSP with 110Kv Yanbu & Badr Network
Project Overview

Interconnection of the 380/110 kV Yanbu-3 desalination bulk supply point with the 110 kV Yanbu and Badr network, including design, supply, construction, protection-system modifications and commissioning.

Client
Saudi Electricity Company (SEC)
Location
Yanbu
Status
Completed
Business
Energy
Project Key Figures
01/02
Interconnection Voltage 380/110 kV
01/02
Related Projects
Construction of 220/22/22 Kv Eastern Extensions Substation, 6th October City, Egypt Completed Energy Construction of 220/22/22 Kv Eastern Extensions Substation, 6th October City, Egypt 6th of October City, Egypt Client: New Urban Communities Authority (NUCA) Design, supply, construction, testing and commissioning of the 220/22/22 kV Eastern Extensions substation in 6th of October City, executed in joint venture with XD EGEMAC. View project Interconnection of 380/132 Kv Ashbailyah Substation with 132 Kv Network in Riyadh Completed Energy Interconnection of 380/132 Kv Ashbailyah Substation with 132 Kv Network in Riyadh Riyadh Client: Saudi Electricity Company (SEC) Interconnection of the 380/132 kV Ashbailyah substation with the Riyadh network in two portions: 14 circuits and 138 km of underground cable along a 46 km route through six districts and 13 substations, with 46 km of fibre optics, 2.3 km of horizontal directional drilling, 333 insulated joints and 138,000 m² of asphalt. View project Construction of Al-Nada 132/13.8 Kv Substation #8220 in Riyadh Completed Energy Construction of Al-Nada 132/13.8 Kv Substation #8220 in Riyadh Client: Saudi Electricity Company (SEC) Construction of a new 132/13.8kV indoor GIS type Substation, arranged in a double-bus-single breaker configuration in AL-NADA  area Riyadh. The Scope of works includes associated works in remote end substation # 9008. The  substation shall be  equipped   with Substation Automation System (SAS) and will be remotely controlled from the SEC Power Control Center (PCC) through a Telecommunication system and gateway View project Power Supply to Riyad Metro Substation (Metro Package 3) Completed Energy Power Supply to Riyad Metro Substation (Metro Package 3) Riyadh Client: Saudi Electricity Company (SEC) Main and standby power supply to the Riyadh Metro Line 2 substation from two bulk supply points: 10 circuits and 144 km of 33 kV underground cable along a 55 km route, 44.5 km of fibre optics, 300 insulated joints, 82,000 m² of asphalt and 400 m of horizontal directional drilling. View project
View All Projects
Next Project Construction of 220/22/22 Kv Eastern Extensions Substation, 6th October City, Egypt