Construction of 220/22/22 Kv Eastern Extensions Substation, 6th October City, Egypt

Home / Projects / Construction of 220/22/22 Kv Eastern Extensions Substation, 6th October City, Egypt
Project Overview

Design, supply, construction, testing and commissioning of the 220/22/22 kV Eastern Extensions substation in 6th of October City, executed in joint venture with XD EGEMAC.

Client
New Urban Communities Authority (NUCA)
Location
6th of October City, Egypt
Status
Completed
Business
Energy
Project Key Figures
01/02
Substation Voltage 220/22/22 kV
01/02
Related Projects
Power Supply to Riyad Metro Substation (Metro Package 3) Completed Energy Power Supply to Riyad Metro Substation (Metro Package 3) Riyadh Client: Saudi Electricity Company (SEC) Main and standby power supply to the Riyadh Metro Line 2 substation from two bulk supply points: 10 circuits and 144 km of 33 kV underground cable along a 55 km route, 44.5 km of fibre optics, 300 insulated joints, 82,000 m² of asphalt and 400 m of horizontal directional drilling. View project Replacement of Existing 110 Kv OHTL by 110 Kv U/G Cable in Front of Jabal Ohud, Madinah Completed Energy Replacement of Existing 110 Kv OHTL by 110 Kv U/G Cable in Front of Jabal Ohud, Madinah Madinah Client: Saudi Electricity Company (SEC) Replacement of the existing 110 kV double-circuit overhead line with a double-circuit underground cable in front of Jabal Ohud in Madinah, covering design, supply, construction and commissioning. View project 380/110 KV BSP and Existing Umlujj North (UMN) 380/132 KV BSP (Ckt 1 & 2) Completed Energy 380/110 KV BSP and Existing Umlujj North (UMN) 380/132 KV BSP (Ckt 1 & 2) Yanbu & Umluj Client: Saudi Electricity Company (SEC) Design, supply and construction of a 380 kV double-circuit overhead transmission line with two OPGW earth wires linking the Yanbu and Umluj North bulk supply points, over a route of approximately 185 km, delivered as an EPC contract. View project Construction Ohtls Lilo Between Al-Hanakiyah And Al-Qassim 2 Completed Energy Construction Ohtls Lilo Between Al-Hanakiyah And Al-Qassim 2 Design, engineer, procure, supply, deliver, construct, install, test, commission, and put into service two (2) 380kV double circuit overhead transmission lines in LILO configuration between Al-Hanakiyah and Al-Qassim 2 BSP, including associated works at substations. View project
View All Projects
Next Project Interconnection of 132/11 Kv Asayel, Forsan & Schools Substations with 132 Kv Network in Dubai