Project Overview

Loop-in/loop-out interconnection of 132 kV circuits between the Asayel, Forsan and Schools substations and several bulk supply points in Dubai, executed in three portions covering design, supply, construction and commissioning.

Client
Dubai Electricity & Water Authority (DEWA)
Location
Dubai, United Arab Emirates
Status
Completed
Business
Energy
Project Key Figures
01/02
3 Execution Portions
01/02
Project Album
Related Projects
Interconnection of 380/110Kv Yanbu-3 SWCC BSP with 110Kv Yanbu & Badr Network Completed Energy Interconnection of 380/110Kv Yanbu-3 SWCC BSP with 110Kv Yanbu & Badr Network Yanbu Client: Saudi Electricity Company (SEC) Interconnection of the 380/110 kV Yanbu-3 desalination bulk supply point with the 110 kV Yanbu and Badr network, including design, supply, construction, protection-system modifications and commissioning. View project Construction of Al-Nada 132/13.8 Kv Substation #8220 in Riyadh Completed Energy Construction of Al-Nada 132/13.8 Kv Substation #8220 in Riyadh Client: Saudi Electricity Company (SEC) Construction of a new 132/13.8kV indoor GIS type Substation, arranged in a double-bus-single breaker configuration in AL-NADA  area Riyadh. The Scope of works includes associated works in remote end substation # 9008. The  substation shall be  equipped   with Substation Automation System (SAS) and will be remotely controlled from the SEC Power Control Center (PCC) through a Telecommunication system and gateway View project Interconnection of 380/132 Kv Ashbailyah Substation with 132 Kv Network in Riyadh Completed Energy Interconnection of 380/132 Kv Ashbailyah Substation with 132 Kv Network in Riyadh Riyadh Client: Saudi Electricity Company (SEC) Interconnection of the 380/132 kV Ashbailyah substation with the Riyadh network in two portions: 14 circuits and 138 km of underground cable along a 46 km route through six districts and 13 substations, with 46 km of fibre optics, 2.3 km of horizontal directional drilling, 333 insulated joints and 138,000 m² of asphalt. View project Construction Ohtls Lilo Between Al-Hanakiyah And Al-Qassim 2 Completed Energy Construction Ohtls Lilo Between Al-Hanakiyah And Al-Qassim 2 Design, engineer, procure, supply, deliver, construct, install, test, commission, and put into service two (2) 380kV double circuit overhead transmission lines in LILO configuration between Al-Hanakiyah and Al-Qassim 2 BSP, including associated works at substations. View project
View All Projects
Next Project Power Supply to Riyad Metro Substation (Metro Package 3)