Skip to main content
Energy

Construction of 132/13.8 Kv Al-Morabaa Substation #8187 in Riyadh

Home / Projects / Construction of 132/13.8 Kv Al-Morabaa Substation #8187 in Riyadh
Project Overview

Construction of a new 132/13.8kV indoor GIS type Substation, arranged in a double-bus-single breaker configuration in NORTH   ALMORABA area Riyadh. The Scope of works includes associated works in remote end Substations # 9052 & 8102 . The  substation  shall be equipped with Substation Automation System (SAS) and will be remotely controlled from the SEC Power Control Center (PCC) through a Telecommunication system and gateway

Client
Saudi Electricity Company (SEC)
Status
Completed
Business
Energy
Project Key Figures
01/03
3 67 MVA
01/03
Related Projects
Power Supply To Jafurah Field Water Injection Hub S/S Project In Hawiyah Area Completed Energy Power Supply To Jafurah Field Water Injection Hub S/S Project In Hawiyah Area Provide detailed engineering and design, procure, supply and deliver all equipment and materials, construct, install, test, commission, and put into service a 115kV double circuit overhead transmission line from Hawiyah 230/115kV BSP to Jafurah Water Injection Hub Substation, including associated modification works at substations. View project Interconnection of 380/132 Kv Ashbailyah Substation with 132 Kv Network in Riyadh Completed Energy Interconnection of 380/132 Kv Ashbailyah Substation with 132 Kv Network in Riyadh Riyadh Client: Saudi Electricity Company (SEC) Interconnection of the 380/132 kV Ashbailyah substation with the Riyadh network in two portions: 14 circuits and 138 km of underground cable along a 46 km route through six districts and 13 substations, with 46 km of fibre optics, 2.3 km of horizontal directional drilling, 333 insulated joints and 138,000 m² of asphalt. View project Power Supply to Dammam Housing Project Completed Energy Power Supply to Dammam Housing Project Dammam Client: Saudi Electricity Company (SEC) Power supply to the Dammam Housing project through 14 circuits and 219 km of 115 kV underground cable along a 73 km route, with 42 km of fibre optics, 687 insulated joints, 99,000 m² of asphalt, 1,136 m of horizontal directional drilling and six kilometres of roadworks, including crossings beneath Aramco pipelines. View project Power Supply to Riyad Metro Substation (Metro Package 3) Completed Energy Power Supply to Riyad Metro Substation (Metro Package 3) Riyadh Client: Saudi Electricity Company (SEC) Main and standby power supply to the Riyadh Metro Line 2 substation from two bulk supply points: 10 circuits and 144 km of 33 kV underground cable along a 55 km route, 44.5 km of fibre optics, 300 insulated joints, 82,000 m² of asphalt and 400 m of horizontal directional drilling. View project
View All Projects
Next Project Connection of New AsSafa BSP Substation #9014 with 132Kv Network