Construction Ohtls Lilo Between Al-Hanakiyah And Al-Qassim 2

Home / Projects / Construction Ohtls Lilo Between Al-Hanakiyah And Al-Qassim 2
Project Overview

Design, engineer, procure, supply, deliver, construct, install, test, commission, and put into service two (2) 380kV double circuit overhead transmission lines in LILO configuration between Al-Hanakiyah and Al-Qassim 2 BSP, including associated works at substations.

Status
Completed
Business
Energy
Related Projects
Construction of Al-Nada 132/13.8 Kv Substation #8220 in Riyadh Completed Energy Construction of Al-Nada 132/13.8 Kv Substation #8220 in Riyadh Client: Saudi Electricity Company (SEC) Construction of a new 132/13.8kV indoor GIS type Substation, arranged in a double-bus-single breaker configuration in AL-NADA  area Riyadh. The Scope of works includes associated works in remote end substation # 9008. The  substation shall be  equipped   with Substation Automation System (SAS) and will be remotely controlled from the SEC Power Control Center (PCC) through a Telecommunication system and gateway View project Power Supply to King Faisal Hospital Jeddah Branch - 110 Kv U/G Cables Portion Completed Energy Power Supply to King Faisal Hospital Jeddah Branch - 110 Kv U/G Cables Portion Jeddah Client: Saudi Electricity Company (SEC) Installation of the 110 kV underground cable circuits feeding King Faisal Specialist Hospital & Research Centre in Jeddah, covering design, supply, construction and commissioning. View project Interconnection of 380/110Kv Yanbu-3 SWCC BSP with 110Kv Yanbu & Badr Network Completed Energy Interconnection of 380/110Kv Yanbu-3 SWCC BSP with 110Kv Yanbu & Badr Network Yanbu Client: Saudi Electricity Company (SEC) Interconnection of the 380/110 kV Yanbu-3 desalination bulk supply point with the 110 kV Yanbu and Badr network, including design, supply, construction, protection-system modifications and commissioning. View project Power Supply to Riyad Metro Substation (Metro Package 3) Completed Energy Power Supply to Riyad Metro Substation (Metro Package 3) Riyadh Client: Saudi Electricity Company (SEC) Main and standby power supply to the Riyadh Metro Line 2 substation from two bulk supply points: 10 circuits and 144 km of 33 kV underground cable along a 55 km route, 44.5 km of fibre optics, 300 insulated joints, 82,000 m² of asphalt and 400 m of horizontal directional drilling. View project
View All Projects
Next Project Al-Adl Project — Main Water Transmission Lines, Makkah