Skip to main content
Energy

Construction of Al-Nada 132/13.8 Kv Substation #8220 in Riyadh

Home / Projects / Construction of Al-Nada 132/13.8 Kv Substation #8220 in Riyadh
Project Overview

Construction of a new 132/13.8kV indoor GIS type Substation, arranged in a double-bus-single breaker configuration in AL-NADA  area Riyadh. The Scope of works includes associated works in remote end substation # 9008. The  substation shall be  equipped   with Substation Automation System (SAS) and will be remotely controlled from the SEC Power Control Center (PCC) through a Telecommunication system and gateway

Client
Saudi Electricity Company (SEC)
Status
Completed
Business
Energy
Project Key Figures
01/03
3 67 MVA
01/03
Project Album
Related Projects
Power Supply to Riyad Metro Substation (Metro Package 3) Completed Energy Power Supply to Riyad Metro Substation (Metro Package 3) Riyadh Client: Saudi Electricity Company (SEC) Main and standby power supply to the Riyadh Metro Line 2 substation from two bulk supply points: 10 circuits and 144 km of 33 kV underground cable along a 55 km route, 44.5 km of fibre optics, 300 insulated joints, 82,000 m² of asphalt and 400 m of horizontal directional drilling. View project Connection of New AsSafa BSP Substation #9014 with 132Kv Network Completed Energy Connection of New AsSafa BSP Substation #9014 with 132Kv Network Central Riyadh — Al-Batha Client: Saudi Electricity Company (SEC) The largest 132 kV underground transmission project in the Central Operating Area: 23 circuits and 308 km of cable along a 103 km route through 12 districts and 12 substations, with 107 km of fibre optics, 4.32 km of horizontal directional drilling, 738 insulated joints and 299,500 m² of asphalt. Contract value USD 102 million. View project Construction of Qassim 380 Kv OHTL Completed Energy Construction of Qassim 380 Kv OHTL Al-Qassim & Al-Zulfi Client: Saudi Electricity Company (SEC) Construction of 380 kV overhead transmission lines and their loop-in/loop-out connection between the Qassim, Sudair and Al-Zulfi substations, executed in two portions in a joint venture. View project Construction Ohtls Lilo Between Al-Hanakiyah And Al-Qassim 2 Completed Energy Construction Ohtls Lilo Between Al-Hanakiyah And Al-Qassim 2 Design, engineer, procure, supply, deliver, construct, install, test, commission, and put into service two (2) 380kV double circuit overhead transmission lines in LILO configuration between Al-Hanakiyah and Al-Qassim 2 BSP, including associated works at substations. View project
View All Projects