Al-Adl Project — Main Water Transmission Lines, Makkah

Home / Projects / Al-Adl Project — Main Water Transmission Lines, Makkah
Project Overview

Design and construction of main water transmission lines completing the water conveyance system of the Holy Capital, approximately 2,500 mm in diameter and about 7 km long, including the design and installation of all connections and valves, to link the Third Ring Road line with the Al-Adl area.

Client
National Water Company (NWC)
Location
Makkah, Saudi Arabia
Status
Ongoing
Business
Water & Sewerage
Project Key Figures
01/03
2,500mm Pipe Diameter