Al-Adl Project — Main Water Transmission Lines, Makkah

Home / Projects / Al-Adl Project — Main Water Transmission Lines, Makkah
Project Overview

Design and construction of main water transmission lines completing the water conveyance system of the Holy Capital, approximately 2,500 mm in diameter and about 7 km long, including the design and installation of all connections and valves, to link the Third Ring Road line with the Al-Adl area.

Client
National Water Company (NWC)
Location
Makkah, Saudi Arabia
Status
Ongoing
Business
Water & Sewerage
Project Key Figures
01/03
2,500mm Pipe Diameter
01/03
Project Album
Related Projects
Construction of Water Transmission Line and Storage Tanks in Arar City Completed Water & Sewerage Construction of Water Transmission Line and Storage Tanks in Arar City Arar Client: Ministry of Environment, Water & Agriculture (MEWA) Construction of a 14 km water transmission line with five glass-fused-to-steel tanks and three pumping stations in Arar, covering design, supply, construction and commissioning. View project Northern Boulevard — Main Trunk Sewer along the Old Jeddah Road Ongoing Water & Sewerage Northern Boulevard — Main Trunk Sewer along the Old Jeddah Road Makkah, Saudi Arabia Client: National Water Company (NWC) Construction of the main trunk sewer along the Old Jeddah Road serving the Northern Boulevard project, with diameters ranging from 1,800 mm down to 800 mm and a total length of approximately 4.5 km. View project Capacity Upgrade of PS-14 Pumping Station and Associated Force Main, Jubail Ongoing Water & Sewerage Capacity Upgrade of PS-14 Pumping Station and Associated Force Main, Jubail Jubail, Saudi Arabia Client: National Water Company (NWC) The project covers three zones: • Zone 1: 73 km of gravity sewers together with a 5 km force main of 500 mm diameter, plus construction of the PS-J01 pumping station rated at 850 m³/hour. • Zone 2: 31 km of gravity sewers together with a 2 km force main of 200 mm diameter, plus construction of the PS-153/7 pumping station rated at 120 m³/hour. • Zone 3: an 8 km force main of 1,200 mm diameter, plus upgrading of the PS-14 pumping station from 3,600 to 7,200 m³/hour. View project Construction of (9) GLS Storage Tanks for Potable Water in Tabuk City Completed Water & Sewerage Construction of (9) GLS Storage Tanks for Potable Water in Tabuk City Tabuk Client: Ministry of Environment, Water & Agriculture (MEWA) Design, supply, construction and testing of nine glass-fused-to-steel (GLS) potable water storage tanks in Tabuk, with the associated electromechanical works. View project
View All Projects
Next Project Ashar Valley Boundary Treatments And Maraya Flood Mitigation