Design and Build of Strategic Potable Water Reservoirs — Phase 1, Hub 06 & Hub 08

Home / Projects / Design and Build of Strategic Potable Water Reservoirs — Phase 1, Hub 06 & Hub 08
Project Overview

Water Reservoir Complex (HUB8): a 15,000 m³ reinforced-concrete strategic reservoir on the original site approved under the Land Use Site Clearance Application (LUSCA). Water Reservoir Complex (HUB6): a 50,000 m³ reinforced-concrete strategic reservoir, together with optional pricing for a 15,000 m³ one-day storage tank, on the site approved under the LUSCA. Enabling infrastructure for both hubs: access road and utility connections to the primary infrastructure (MV/LV power, ICT, water, wastewater), a SCADA system with a control room for decentralised operation and control, an electrical area, an inlet control and metering chamber, pipelines, mechanical and electrical equipment, instrumentation, fibre-optic provisions and conduits, a guard house with ablution facilities, fencing, security systems and stormwater drainage, as well as interfacing with the existing and under-construction National Water Company facilities at HUB6.

Client
Royal Commission for AlUla (RCU)
Location
AlUla, Saudi Arabia
Status
Ongoing
Business
Water & Sewerage
Secondary Classification
Project Key Figures
01/04
50,000m3 Hub 6 Reservoir Capacity
01/04
Project Album
Related Projects
Stormwater Drainage for Area (BC) — Package No. 4 — Al-Rawdah District — 17168 Ongoing Water & Sewerage Stormwater Drainage for Area (BC) — Package No. 4 — Al-Rawdah District — 17168 Jeddah, Saudi Arabia Client: Jeddah Municipality The project lowers the level of standing surface water during rainfall by constructing a stormwater drainage network in the Al-Rawdah district. Runoff is collected from the catchment areas through parallel road drainage units (PRD) and catch basins; every storm inlet is connected to a manhole by FRP pipework, and the manholes are interconnected with reinforced-concrete pipes, so that stormwater is collected and conveyed through the drainage network. View project Capacity Upgrade of PS-14 Pumping Station and Associated Force Main, Jubail Ongoing Water & Sewerage Capacity Upgrade of PS-14 Pumping Station and Associated Force Main, Jubail Jubail, Saudi Arabia Client: National Water Company (NWC) The project covers three zones: • Zone 1: 73 km of gravity sewers together with a 5 km force main of 500 mm diameter, plus construction of the PS-J01 pumping station rated at 850 m³/hour. • Zone 2: 31 km of gravity sewers together with a 2 km force main of 200 mm diameter, plus construction of the PS-153/7 pumping station rated at 120 m³/hour. • Zone 3: an 8 km force main of 1,200 mm diameter, plus upgrading of the PS-14 pumping station from 3,600 to 7,200 m³/hour. View project Construction of Water Transmission Line and Storage Tanks in Arar City Completed Water & Sewerage Construction of Water Transmission Line and Storage Tanks in Arar City Arar Client: Ministry of Environment, Water & Agriculture (MEWA) Construction of a 14 km water transmission line with five glass-fused-to-steel tanks and three pumping stations in Arar, covering design, supply, construction and commissioning. View project Design and Construction of Sewerage Networks, Pumping Stations and Trunk Sewer Lines for Al-Aziziyah and Other Districts, Al-Khobar Governorate — Phase 1, Part 2 Ongoing Water & Sewerage Design and Construction of Sewerage Networks, Pumping Stations and Trunk Sewer Lines for Al-Aziziyah and Other Districts, Al-Khobar Governorate — Phase 1, Part 2 Al-Khobar, Saudi Arabia Client: National Water Company (NWC) The project lowers the surface-water table caused by uncontrolled wastewater discharge and addresses the environmental and public-health impacts of groundwater contamination, while extending sewerage service to the Al-Taawun, Al-Hamra, Ibn Sina, Al-Fawaziyah Industrial and Al-Sawari districts and further areas of Al-Khobar, in line with the National Water Company strategy, the Supply and Demand Document and Saudi Vision 2030. The scope comprises 95,867 linear metres of gravity sewers in diameters from 200 mm to 1,100 mm, 21,273 linear metres of force mains in diameters from 150 mm to 900 mm, the construction of four new pumping stations and the rehabilitation of six existing pumping stations. View project
View All Projects
Next Project Design and Construction of Sewerage Networks, Pumping Stations and Trunk Sewer Lines for Al-Aziziyah and Other Districts, Al-Khobar Governorate — Phase 1, Part 2