Skip to main content
Water & Sewerage

Design and Build of Strategic Potable Water Reservoirs — Phase 1, Hub 06 & Hub 08

Home / Projects / Design and Build of Strategic Potable Water Reservoirs — Phase 1, Hub 06 & Hub 08
Project Overview

Water Reservoir Complex (HUB8): a 15,000 m³ reinforced-concrete strategic reservoir on the original site approved under the Land Use Site Clearance Application (LUSCA). Water Reservoir Complex (HUB6): a 50,000 m³ reinforced-concrete strategic reservoir, together with optional pricing for a 15,000 m³ one-day storage tank, on the site approved under the LUSCA. Enabling infrastructure for both hubs: access road and utility connections to the primary infrastructure (MV/LV power, ICT, water, wastewater), a SCADA system with a control room for decentralised operation and control, an electrical area, an inlet control and metering chamber, pipelines, mechanical and electrical equipment, instrumentation, fibre-optic provisions and conduits, a guard house with ablution facilities, fencing, security systems and stormwater drainage, as well as interfacing with the existing and under-construction National Water Company facilities at HUB6.

Client
Royal Commission for AlUla (RCU)
Location
AlUla, Saudi Arabia
Status
Ongoing
Business
Water & Sewerage
Secondary Classification
Project Key Figures
01/04
50,000m3 Hub 6 Reservoir Capacity
01/04
Project Album
Related Projects
East Hidd Water Pumping Station (EPC1) Completed Water & Sewerage East Hidd Water Pumping Station (EPC1) East Hidd, Kingdom of Bahrain Client: Ministry of Housing, Bahrain (MOH) Construction of the East Hidd water distribution station on a 6,200 m² site, comprising a semi-buried concrete reservoir of no less than two million gallons and an automated pumping station with variable-speed pumps rated at five million gallons per day, together with all site and utility works, delivered as an EPC contract. View project Northern Boulevard — Main Trunk Sewer along the Old Jeddah Road Ongoing Water & Sewerage Northern Boulevard — Main Trunk Sewer along the Old Jeddah Road Makkah, Saudi Arabia Client: National Water Company (NWC) Construction of the main trunk sewer along the Old Jeddah Road serving the Northern Boulevard project, with diameters ranging from 1,800 mm down to 800 mm and a total length of approximately 4.5 km. View project Construction of (9) GLS Storage Tanks for Potable Water in Tabuk City Completed Water & Sewerage Construction of (9) GLS Storage Tanks for Potable Water in Tabuk City Tabuk Client: Ministry of Environment, Water & Agriculture (MEWA) Design, supply, construction and testing of nine glass-fused-to-steel (GLS) potable water storage tanks in Tabuk, with the associated electromechanical works. View project Design and Build of Supporting Facilities for Terminal-0 Activation, OXAGON Port Completed Road Construction & Marine Works Design and Build of Supporting Facilities for Terminal-0 Activation, OXAGON Port The scope of this project is the Design and Construction of the Container Activation Terminal T0, including:Customs Inspection buildings x 3Customs Office buildingAdministration OfficeClinicMaintenance buildingCanteen and LockersLeaky Container facilityComplete Infrastructure for the External General Layout Works View project
View All Projects
Next Project Design and Construction of Sewerage Networks, Pumping Stations and Trunk Sewer Lines for Al-Aziziyah and Other Districts, Al-Khobar Governorate — Phase 1, Part 2