Design and Construction of Sewerage Networks, Pumping Stations and Trunk Sewer Lines for Al-Aziziyah and Other Districts, Al-Khobar Governorate — Phase 1, Part 2

Home / Projects / Design and Construction of Sewerage Networks, Pumping Stations and Trunk Sewer Lines for Al-Aziziyah and Other Districts, Al-Khobar Governorate — Phase 1, Part 2
Project Overview

The project lowers the surface-water table caused by uncontrolled wastewater discharge and addresses the environmental and public-health impacts of groundwater contamination, while extending sewerage service to the Al-Taawun, Al-Hamra, Ibn Sina, Al-Fawaziyah Industrial and Al-Sawari districts and further areas of Al-Khobar, in line with the National Water Company strategy, the Supply and Demand Document and Saudi Vision 2030. The scope comprises 95,867 linear metres of gravity sewers in diameters from 200 mm to 1,100 mm, 21,273 linear metres of force mains in diameters from 150 mm to 900 mm, the construction of four new pumping stations and the rehabilitation of six existing pumping stations.

Client
National Water Company (NWC)
Location
Al-Khobar, Saudi Arabia
Status
Ongoing
Business
Water & Sewerage
Secondary Classification
Project Key Figures
01/04
Gravity Sewer Length 95,867 m
01/04
Project Album
Related Projects
Al-Adl Project — Main Water Transmission Lines, Makkah Ongoing Water & Sewerage Al-Adl Project — Main Water Transmission Lines, Makkah Makkah, Saudi Arabia Client: National Water Company (NWC) Design and construction of main water transmission lines completing the water conveyance system of the Holy Capital, approximately 2,500 mm in diameter and about 7 km long, including the design and installation of all connections and valves, to link the Third Ring Road line with the Al-Adl area. View project Southern Boulevard — Main Trunk Sewer along the Fourth Ring Road Ongoing Water & Sewerage Southern Boulevard — Main Trunk Sewer along the Fourth Ring Road Makkah, Saudi Arabia Client: National Water Company (NWC) Construction of the main trunk sewer along the Fourth Ring Road serving the Southern Boulevard project in Makkah, approximately 2,400 mm in diameter and about 13 km in total length. View project Design and Build of Strategic Potable Water Reservoirs — Phase 1, Hub 06 & Hub 08 Ongoing Water & Sewerage Design and Build of Strategic Potable Water Reservoirs — Phase 1, Hub 06 & Hub 08 AlUla, Saudi Arabia Client: Royal Commission for AlUla (RCU) Water Reservoir Complex (HUB8): a 15,000 m³ reinforced-concrete strategic reservoir on the original site approved under the Land Use Site Clearance Application (LUSCA). Water Reservoir Complex (HUB6): a 50,000 m³ reinforced-concrete strategic reservoir, together with optional pricing for a 15,000 m³ one-day storage tank, on the site approved under the LUSCA. Enabling infrastructure for both hubs: access road and utility connections to the primary infrastructure (MV/LV power, ICT, water, wastewater), a SCADA system with a control room for decentralised operation and control, an electrical area, an inlet control and metering chamber, pipelines, mechanical and electrical equipment, instrumentation, fibre-optic provisions and conduits, a guard house with ablution facilities, fencing, security systems and stormwater drainage, as well as interfacing with the existing and under-construction National Water Company facilities at HUB6. View project Bahra Project — Surface-Water Level Reduction Network Ongoing Water & Sewerage Bahra Project — Surface-Water Level Reduction Network Bahra, Jeddah Governorate, Saudi Arabia Client: National Water Company (NWC) Construction of a surface-water level reduction network under the Dengue Fever Control Programme in Jeddah Governorate, serving the districts of Bahra, with a total length of approximately 50 km. View project
View All Projects
Next Project Stormwater Drainage for Area (BC) — Package No. 4 — Al-Rawdah District — 17168