Construction of Incomplete Sanitary Mainlines and Branch Networks in Jeddah — Contract 8

Home / Projects / Construction of Incomplete Sanitary Mainlines and Branch Networks in Jeddah — Contract 8
Project Overview

The project completes the outstanding sewer trunk mains and constructs the branch networks serving the Al-Kawthar, Al-Hamdaniyah, Al-Manar and Al-Samer districts of Jeddah. The network totals 189,536 linear metres of GRP pipework with 2,785 manholes, in addition to the rehabilitation of 46,444 linear metres of existing networks and trunk mains.

Client
National Water Company (NWC)
Location
Jeddah, Saudi Arabia
Status
Ongoing
Business
Water & Sewerage
Project Key Figures
01/04
Total Network Length 189,536 m
01/04
Project Album
Related Projects
Design and Build of Strategic Potable Water Reservoirs — Phase 1, Hub 06 & Hub 08 Ongoing Water & Sewerage Design and Build of Strategic Potable Water Reservoirs — Phase 1, Hub 06 & Hub 08 AlUla, Saudi Arabia Client: Royal Commission for AlUla (RCU) Water Reservoir Complex (HUB8): a 15,000 m³ reinforced-concrete strategic reservoir on the original site approved under the Land Use Site Clearance Application (LUSCA). Water Reservoir Complex (HUB6): a 50,000 m³ reinforced-concrete strategic reservoir, together with optional pricing for a 15,000 m³ one-day storage tank, on the site approved under the LUSCA. Enabling infrastructure for both hubs: access road and utility connections to the primary infrastructure (MV/LV power, ICT, water, wastewater), a SCADA system with a control room for decentralised operation and control, an electrical area, an inlet control and metering chamber, pipelines, mechanical and electrical equipment, instrumentation, fibre-optic provisions and conduits, a guard house with ablution facilities, fencing, security systems and stormwater drainage, as well as interfacing with the existing and under-construction National Water Company facilities at HUB6. View project Northern Boulevard — Main Trunk Sewer along the Old Jeddah Road Ongoing Water & Sewerage Northern Boulevard — Main Trunk Sewer along the Old Jeddah Road Makkah, Saudi Arabia Client: National Water Company (NWC) Construction of the main trunk sewer along the Old Jeddah Road serving the Northern Boulevard project, with diameters ranging from 1,800 mm down to 800 mm and a total length of approximately 4.5 km. View project Construction of Sewer Lines and Sewerage Network in West Buraidah Completed Water & Sewerage Construction of Sewer Lines and Sewerage Network in West Buraidah Buraidah, Al-Qassim Region Client: Ministry of Environment, Water & Agriculture (MEWA) Construction of the gravity sewer line and network in West Buraidah along a 14 km route: 6,026 m by micro-tunnelling and 7,093 m by open cut, with 101 manholes and 31 shafts, 75,000 m³ of excavation, 45,000 m³ of backfill and 8,000 m² of asphalt. Ground slope and invert depths reaching 27 m made tunnelling the only viable method. View project Construction of (9) GLS Storage Tanks for Potable Water in Tabuk City Completed Water & Sewerage Construction of (9) GLS Storage Tanks for Potable Water in Tabuk City Tabuk Client: Ministry of Environment, Water & Agriculture (MEWA) Design, supply, construction and testing of nine glass-fused-to-steel (GLS) potable water storage tanks in Tabuk, with the associated electromechanical works. View project
View All Projects
Next Project Capacity Upgrade of PS-14 Pumping Station and Associated Force Main, Jubail