Northern Boulevard — Main Trunk Sewer along the Old Jeddah Road

Home / Projects / Northern Boulevard — Main Trunk Sewer along the Old Jeddah Road
Project Overview

Construction of the main trunk sewer along the Old Jeddah Road serving the Northern Boulevard project, with diameters ranging from 1,800 mm down to 800 mm and a total length of approximately 4.5 km.

Client
National Water Company (NWC)
Location
Makkah, Saudi Arabia
Status
Ongoing
Business
Water & Sewerage
Project Key Figures
01/03
Pipe Diameters 1,800 – 800 mm
01/03
Project Album
Related Projects
Capacity Upgrade of PS-14 Pumping Station and Associated Force Main, Jubail Ongoing Water & Sewerage Capacity Upgrade of PS-14 Pumping Station and Associated Force Main, Jubail Jubail, Saudi Arabia Client: National Water Company (NWC) The project covers three zones: • Zone 1: 73 km of gravity sewers together with a 5 km force main of 500 mm diameter, plus construction of the PS-J01 pumping station rated at 850 m³/hour. • Zone 2: 31 km of gravity sewers together with a 2 km force main of 200 mm diameter, plus construction of the PS-153/7 pumping station rated at 120 m³/hour. • Zone 3: an 8 km force main of 1,200 mm diameter, plus upgrading of the PS-14 pumping station from 3,600 to 7,200 m³/hour. View project Bahra Project — Surface-Water Level Reduction Network Ongoing Water & Sewerage Bahra Project — Surface-Water Level Reduction Network Bahra, Jeddah Governorate, Saudi Arabia Client: National Water Company (NWC) Construction of a surface-water level reduction network under the Dengue Fever Control Programme in Jeddah Governorate, serving the districts of Bahra, with a total length of approximately 50 km. View project Al-Adl Project — Main Water Transmission Lines, Makkah Ongoing Water & Sewerage Al-Adl Project — Main Water Transmission Lines, Makkah Makkah, Saudi Arabia Client: National Water Company (NWC) Design and construction of main water transmission lines completing the water conveyance system of the Holy Capital, approximately 2,500 mm in diameter and about 7 km long, including the design and installation of all connections and valves, to link the Third Ring Road line with the Al-Adl area. View project Design and Build of Strategic Potable Water Reservoirs — Phase 1, Hub 06 & Hub 08 Ongoing Water & Sewerage Design and Build of Strategic Potable Water Reservoirs — Phase 1, Hub 06 & Hub 08 AlUla, Saudi Arabia Client: Royal Commission for AlUla (RCU) Water Reservoir Complex (HUB8): a 15,000 m³ reinforced-concrete strategic reservoir on the original site approved under the Land Use Site Clearance Application (LUSCA). Water Reservoir Complex (HUB6): a 50,000 m³ reinforced-concrete strategic reservoir, together with optional pricing for a 15,000 m³ one-day storage tank, on the site approved under the LUSCA. Enabling infrastructure for both hubs: access road and utility connections to the primary infrastructure (MV/LV power, ICT, water, wastewater), a SCADA system with a control room for decentralised operation and control, an electrical area, an inlet control and metering chamber, pipelines, mechanical and electrical equipment, instrumentation, fibre-optic provisions and conduits, a guard house with ablution facilities, fencing, security systems and stormwater drainage, as well as interfacing with the existing and under-construction National Water Company facilities at HUB6. View project
View All Projects
Next Project Design and Build of Strategic Potable Water Reservoirs — Phase 1, Hub 06 & Hub 08