East Hidd Water Pumping Station (EPC1)

Home / Projects / East Hidd Water Pumping Station (EPC1)
Project Overview

Construction of the East Hidd water distribution station on a 6,200 m² site, comprising a semi-buried concrete reservoir of no less than two million gallons and an automated pumping station with variable-speed pumps rated at five million gallons per day, together with all site and utility works, delivered as an EPC contract.

Client
Ministry of Housing, Bahrain (MOH)
Location
East Hidd, Kingdom of Bahrain
Status
Completed
Business
Water & Sewerage
Project Key Figures
01/03
Reservoir Capacity 2 million gallons
01/03
Project Album
Related Projects
Capacity Upgrade of PS-14 Pumping Station and Associated Force Main, Jubail Ongoing Water & Sewerage Capacity Upgrade of PS-14 Pumping Station and Associated Force Main, Jubail Jubail, Saudi Arabia Client: National Water Company (NWC) The project covers three zones: • Zone 1: 73 km of gravity sewers together with a 5 km force main of 500 mm diameter, plus construction of the PS-J01 pumping station rated at 850 m³/hour. • Zone 2: 31 km of gravity sewers together with a 2 km force main of 200 mm diameter, plus construction of the PS-153/7 pumping station rated at 120 m³/hour. • Zone 3: an 8 km force main of 1,200 mm diameter, plus upgrading of the PS-14 pumping station from 3,600 to 7,200 m³/hour. View project Construction of Water Transmission Line and Storage Tanks in Arar City Completed Water & Sewerage Construction of Water Transmission Line and Storage Tanks in Arar City Arar Client: Ministry of Environment, Water & Agriculture (MEWA) Construction of a 14 km water transmission line with five glass-fused-to-steel tanks and three pumping stations in Arar, covering design, supply, construction and commissioning. View project Design and Build of Strategic Potable Water Reservoirs — Phase 1, Hub 06 & Hub 08 Ongoing Water & Sewerage Design and Build of Strategic Potable Water Reservoirs — Phase 1, Hub 06 & Hub 08 AlUla, Saudi Arabia Client: Royal Commission for AlUla (RCU) Water Reservoir Complex (HUB8): a 15,000 m³ reinforced-concrete strategic reservoir on the original site approved under the Land Use Site Clearance Application (LUSCA). Water Reservoir Complex (HUB6): a 50,000 m³ reinforced-concrete strategic reservoir, together with optional pricing for a 15,000 m³ one-day storage tank, on the site approved under the LUSCA. Enabling infrastructure for both hubs: access road and utility connections to the primary infrastructure (MV/LV power, ICT, water, wastewater), a SCADA system with a control room for decentralised operation and control, an electrical area, an inlet control and metering chamber, pipelines, mechanical and electrical equipment, instrumentation, fibre-optic provisions and conduits, a guard house with ablution facilities, fencing, security systems and stormwater drainage, as well as interfacing with the existing and under-construction National Water Company facilities at HUB6. View project Southern Boulevard — Main Trunk Sewer along the Fourth Ring Road Ongoing Water & Sewerage Southern Boulevard — Main Trunk Sewer along the Fourth Ring Road Makkah, Saudi Arabia Client: National Water Company (NWC) Construction of the main trunk sewer along the Fourth Ring Road serving the Southern Boulevard project in Makkah, approximately 2,400 mm in diameter and about 13 km in total length. View project
View All Projects
Next Project King Abdullah Bin Abdulaziz Medical City (KAMC) Phase 1 - Package 2 – Infrastructure Works