Skip to main content
Water & Sewerage

Construction of Sewer Lines and Sewerage Network in West Buraidah

Home / Projects / Construction of Sewer Lines and Sewerage Network in West Buraidah
Project Overview

Construction of the gravity sewer line and network in West Buraidah along a 14 km route: 6,026 m by micro-tunnelling and 7,093 m by open cut, with 101 manholes and 31 shafts, 75,000 m³ of excavation, 45,000 m³ of backfill and 8,000 m² of asphalt. Ground slope and invert depths reaching 27 m made tunnelling the only viable method.

Client
Ministry of Environment, Water & Agriculture (MEWA)
Location
Buraidah, Al-Qassim Region
Status
Completed
Business
Water & Sewerage
Project Key Figures
01/04
14km Route Length
01/04
Project Album
Related Projects
Al-Adl Project — Main Water Transmission Lines, Makkah Ongoing Water & Sewerage Al-Adl Project — Main Water Transmission Lines, Makkah Makkah, Saudi Arabia Client: National Water Company (NWC) Design and construction of main water transmission lines completing the water conveyance system of the Holy Capital, approximately 2,500 mm in diameter and about 7 km long, including the design and installation of all connections and valves, to link the Third Ring Road line with the Al-Adl area. View project Construction of Water Transmission Line and Storage Tanks in Arar City Completed Water & Sewerage Construction of Water Transmission Line and Storage Tanks in Arar City Arar Client: Ministry of Environment, Water & Agriculture (MEWA) Construction of a 14 km water transmission line with five glass-fused-to-steel tanks and three pumping stations in Arar, covering design, supply, construction and commissioning. View project Capacity Upgrade of PS-14 Pumping Station and Associated Force Main, Jubail Ongoing Water & Sewerage Capacity Upgrade of PS-14 Pumping Station and Associated Force Main, Jubail Jubail, Saudi Arabia Client: National Water Company (NWC) The project covers three zones: • Zone 1: 73 km of gravity sewers together with a 5 km force main of 500 mm diameter, plus construction of the PS-J01 pumping station rated at 850 m³/hour. • Zone 2: 31 km of gravity sewers together with a 2 km force main of 200 mm diameter, plus construction of the PS-153/7 pumping station rated at 120 m³/hour. • Zone 3: an 8 km force main of 1,200 mm diameter, plus upgrading of the PS-14 pumping station from 3,600 to 7,200 m³/hour. View project East Hidd Water Pumping Station (EPC1) Completed Water & Sewerage East Hidd Water Pumping Station (EPC1) East Hidd, Kingdom of Bahrain Client: Ministry of Housing, Bahrain (MOH) Construction of the East Hidd water distribution station on a 6,200 m² site, comprising a semi-buried concrete reservoir of no less than two million gallons and an automated pumping station with variable-speed pumps rated at five million gallons per day, together with all site and utility works, delivered as an EPC contract. View project
View All Projects
Next Project Construction of Incomplete Sanitary Mainlines and Branch Networks in Jeddah — Contract 8