Project Overview
Construction of the gravity sewer line and network in West Buraidah along a 14 km route: 6,026 m by micro-tunnelling and 7,093 m by open cut, with 101 manholes and 31 shafts, 75,000 m³ of excavation, 45,000 m³ of backfill and 8,000 m² of asphalt. Ground slope and invert depths reaching 27 m made tunnelling the only viable method.
- Client
- Ministry of Environment, Water & Agriculture (MEWA)
- Location
- Buraidah, Al-Qassim Region
- Status
- Completed
- Business
- Water & Sewerage
Project Key Figures
01/04
14km
Route Length
6,026m
Microtunneling Length
7,093m
Open-Cut Excavation Length
101
Manholes