Project Overview

Construction of 380 kV overhead transmission lines and their loop-in/loop-out connection between the Qassim, Sudair and Al-Zulfi substations, executed in two portions in a joint venture.

Client
Saudi Electricity Company (SEC)
Location
Al-Qassim & Al-Zulfi
Status
Completed
Business
Energy
Project Key Figures
01/02
2 Execution Portions
01/02
Related Projects
Interconnection of 132/11 Kv Asayel, Forsan & Schools Substations with 132 Kv Network in Dubai Completed Energy Interconnection of 132/11 Kv Asayel, Forsan & Schools Substations with 132 Kv Network in Dubai Dubai, United Arab Emirates Client: Dubai Electricity & Water Authority (DEWA) Loop-in/loop-out interconnection of 132 kV circuits between the Asayel, Forsan and Schools substations and several bulk supply points in Dubai, executed in three portions covering design, supply, construction and commissioning. View project Reinforcement  of Hutat Sudair  132/33Kv Substation #8502 in Hutat Sudair Completed Energy Reinforcement of Hutat Sudair 132/33Kv Substation #8502 in Hutat Sudair Client: Saudi Electricity Company (SEC)  Reinforcement the capacity at existing 132/33kV S/S#8502  by adding 3rd 100 MVA 132/33kV transformer, extending the  existing 33kV switchgear at section ‘B’ by adding two(2) 800A feeder panels, and also adding new section “C” to meet load growth requirements of the area View project Construction of 220/22/22 Kv Eastern Extensions Substation, 6th October City, Egypt Completed Energy Construction of 220/22/22 Kv Eastern Extensions Substation, 6th October City, Egypt 6th of October City, Egypt Client: New Urban Communities Authority (NUCA) Design, supply, construction, testing and commissioning of the 220/22/22 kV Eastern Extensions substation in 6th of October City, executed in joint venture with XD EGEMAC. View project Power Supply to Riyad Metro Substation (Metro Package 3) Completed Energy Power Supply to Riyad Metro Substation (Metro Package 3) Riyadh Client: Saudi Electricity Company (SEC) Main and standby power supply to the Riyadh Metro Line 2 substation from two bulk supply points: 10 circuits and 144 km of 33 kV underground cable along a 55 km route, 44.5 km of fibre optics, 300 insulated joints, 82,000 m² of asphalt and 400 m of horizontal directional drilling. View project
View All Projects
Next Project Reinforcement of Hutat Sudair 132/33Kv Substation #8502 in Hutat Sudair