Project Overview

Design, supply and construction of a 380 kV double-circuit overhead transmission line with two OPGW earth wires linking the Yanbu and Umluj North bulk supply points, over a route of approximately 185 km, delivered as an EPC contract.

Client
Saudi Electricity Company (SEC)
Location
Yanbu & Umluj
Status
Completed
Business
Energy
Project Key Figures
01/03
185km Route Length
01/03
Related Projects
Interconnection of 380/110Kv Yanbu-3 SWCC BSP with 110Kv Yanbu & Badr Network Completed Energy Interconnection of 380/110Kv Yanbu-3 SWCC BSP with 110Kv Yanbu & Badr Network Yanbu Client: Saudi Electricity Company (SEC) Interconnection of the 380/110 kV Yanbu-3 desalination bulk supply point with the 110 kV Yanbu and Badr network, including design, supply, construction, protection-system modifications and commissioning. View project Power Supply to Dammam Housing Project Completed Energy Power Supply to Dammam Housing Project Dammam Client: Saudi Electricity Company (SEC) Power supply to the Dammam Housing project through 14 circuits and 219 km of 115 kV underground cable along a 73 km route, with 42 km of fibre optics, 687 insulated joints, 99,000 m² of asphalt, 1,136 m of horizontal directional drilling and six kilometres of roadworks, including crossings beneath Aramco pipelines. View project Connection of New AsSafa BSP Substation #9014 with 132Kv Network Completed Energy Connection of New AsSafa BSP Substation #9014 with 132Kv Network Central Riyadh — Al-Batha Client: Saudi Electricity Company (SEC) The largest 132 kV underground transmission project in the Central Operating Area: 23 circuits and 308 km of cable along a 103 km route through 12 districts and 12 substations, with 107 km of fibre optics, 4.32 km of horizontal directional drilling, 738 insulated joints and 299,500 m² of asphalt. Contract value USD 102 million. View project Construction of 220/22/22 Kv Eastern Extensions Substation, 6th October City, Egypt Completed Energy Construction of 220/22/22 Kv Eastern Extensions Substation, 6th October City, Egypt 6th of October City, Egypt Client: New Urban Communities Authority (NUCA) Design, supply, construction, testing and commissioning of the 220/22/22 kV Eastern Extensions substation in 6th of October City, executed in joint venture with XD EGEMAC. View project
View All Projects
Next Project East Hidd Water Pumping Station (EPC1)