Project Overview

The largest 132 kV underground transmission project in the Central Operating Area: 23 circuits and 308 km of cable along a 103 km route through 12 districts and 12 substations, with 107 km of fibre optics, 4.32 km of horizontal directional drilling, 738 insulated joints and 299,500 m² of asphalt. Contract value USD 102 million.

Client
Saudi Electricity Company (SEC)
Location
Central Riyadh — Al-Batha
Status
Completed
Business
Energy
Project Key Figures
01/04
23 Circuits
01/04
Project Album
Related Projects
Construction Ohtls Lilo Between Al-Hanakiyah And Al-Qassim 2 Completed Energy Construction Ohtls Lilo Between Al-Hanakiyah And Al-Qassim 2 Design, engineer, procure, supply, deliver, construct, install, test, commission, and put into service two (2) 380kV double circuit overhead transmission lines in LILO configuration between Al-Hanakiyah and Al-Qassim 2 BSP, including associated works at substations. View project Interconnection of 132/11 Kv Asayel, Forsan & Schools Substations with 132 Kv Network in Dubai Completed Energy Interconnection of 132/11 Kv Asayel, Forsan & Schools Substations with 132 Kv Network in Dubai Dubai, United Arab Emirates Client: Dubai Electricity & Water Authority (DEWA) Loop-in/loop-out interconnection of 132 kV circuits between the Asayel, Forsan and Schools substations and several bulk supply points in Dubai, executed in three portions covering design, supply, construction and commissioning. View project Power Supply to Riyad Metro Substation (Metro Package 3) Completed Energy Power Supply to Riyad Metro Substation (Metro Package 3) Riyadh Client: Saudi Electricity Company (SEC) Main and standby power supply to the Riyadh Metro Line 2 substation from two bulk supply points: 10 circuits and 144 km of 33 kV underground cable along a 55 km route, 44.5 km of fibre optics, 300 insulated joints, 82,000 m² of asphalt and 400 m of horizontal directional drilling. View project Construction of 220/22/22 Kv Eastern Extensions Substation, 6th October City, Egypt Completed Energy Construction of 220/22/22 Kv Eastern Extensions Substation, 6th October City, Egypt 6th of October City, Egypt Client: New Urban Communities Authority (NUCA) Design, supply, construction, testing and commissioning of the 220/22/22 kV Eastern Extensions substation in 6th of October City, executed in joint venture with XD EGEMAC. View project