Construction of 132/13.8 Kv Salahualdeen Substation #8219 in Riyadh

Home / Projects / Construction of 132/13.8 Kv Salahualdeen Substation #8219 in Riyadh
Project Overview

Construction of a new 132/13.8kV indoor GIS type Substation, arranged in a double-bus-single breaker configuration in SALAH-ALDEEN  area Riyadh. The Scope of works includes associated works in remote end substation # 8088. The  substation shall be  equipped with Substation Automation System (SAS) and will be remotely controlled from the SEC Power Control Center (PCC) through  Telecommunication system and gateway

Client
Saudi Electricity Company (SEC)
Status
Ongoing
Business
Energy
Project Key Figures
01/03
3 67 MVA
01/03
Project Album
Related Projects
Reliability Enhancement For SS's Of Taif East Governorate (TEG) Discrete Group In Taif Area-OHTL Completed Energy Reliability Enhancement For SS's Of Taif East Governorate (TEG) Discrete Group In Taif Area-OHTL Design, engineer, procure, supply, deliver, construct, install, test, commission, and put into service overhead transmission line works for enhancing reliability of Taif East Governorate substations, including integration with existing substations and associated systems. View project Replacement of Existing 110 Kv OHTL by 110 Kv U/G Cable in Front of Jabal Ohud, Madinah Completed Energy Replacement of Existing 110 Kv OHTL by 110 Kv U/G Cable in Front of Jabal Ohud, Madinah Madinah Client: Saudi Electricity Company (SEC) Replacement of the existing 110 kV double-circuit overhead line with a double-circuit underground cable in front of Jabal Ohud in Madinah, covering design, supply, construction and commissioning. View project Construction of 132/13.8 Kv Al-Morabaa Substation #8187 in Riyadh Completed Energy Construction of 132/13.8 Kv Al-Morabaa Substation #8187 in Riyadh Client: Saudi Electricity Company (SEC) Construction of a new 132/13.8kV indoor GIS type Substation, arranged in a double-bus-single breaker configuration in NORTH   ALMORABA area Riyadh. The Scope of works includes associated works in remote end Substations # 9052 & 8102 . The  substation  shall be equipped with Substation Automation System (SAS) and will be remotely controlled from the SEC Power Control Center (PCC) through a Telecommunication system and gateway View project Connection of New AsSafa BSP Substation #9014 with 132Kv Network Completed Energy Connection of New AsSafa BSP Substation #9014 with 132Kv Network Central Riyadh — Al-Batha Client: Saudi Electricity Company (SEC) The largest 132 kV underground transmission project in the Central Operating Area: 23 circuits and 308 km of cable along a 103 km route through 12 districts and 12 substations, with 107 km of fibre optics, 4.32 km of horizontal directional drilling, 738 insulated joints and 299,500 m² of asphalt. Contract value USD 102 million. View project
View All Projects
Next Project Power Supply to Dammam Housing Project