Project Overview
Construction of a new 132/13.8kV indoor GIS type Substation, arranged in a double-bus-single breaker configuration in SALAH-ALDEEN area Riyadh. The Scope of works includes associated works in remote end substation # 8088. The substation shall be equipped with Substation Automation System (SAS) and will be remotely controlled from the SEC Power Control Center (PCC) through Telecommunication system and gateway
- Client
- Saudi Electricity Company (SEC)
- Status
- Ongoing
- Business
- Energy
Project Key Figures
01/03
3
67 MVA
10
Gas-Insulated Switchgear (GIS)
48
Switchgear (SWGR)