Skip to main content
Water & Sewerage

Southern Boulevard — Main Trunk Sewer along the Fourth Ring Road

Home / Projects / Southern Boulevard — Main Trunk Sewer along the Fourth Ring Road
Project Overview

Construction of the main trunk sewer along the Fourth Ring Road serving the Southern Boulevard project in Makkah, approximately 2,400 mm in diameter and about 13 km in total length.

Client
National Water Company (NWC)
Location
Makkah, Saudi Arabia
Status
Ongoing
Business
Water & Sewerage
Project Key Figures
01/03
2,400mm Pipe Diameter
01/03
Project Album
Related Projects
Construction of Sewer Lines and Sewerage Network in West Buraidah Completed Water & Sewerage Construction of Sewer Lines and Sewerage Network in West Buraidah Buraidah, Al-Qassim Region Client: Ministry of Environment, Water & Agriculture (MEWA) Construction of the gravity sewer line and network in West Buraidah along a 14 km route: 6,026 m by micro-tunnelling and 7,093 m by open cut, with 101 manholes and 31 shafts, 75,000 m³ of excavation, 45,000 m³ of backfill and 8,000 m² of asphalt. Ground slope and invert depths reaching 27 m made tunnelling the only viable method. View project Design and Construction of Sewerage Networks, Pumping Stations and Trunk Sewer Lines for Al-Aziziyah and Other Districts, Al-Khobar Governorate — Phase 1, Part 2 Ongoing Water & Sewerage Design and Construction of Sewerage Networks, Pumping Stations and Trunk Sewer Lines for Al-Aziziyah and Other Districts, Al-Khobar Governorate — Phase 1, Part 2 Al-Khobar, Saudi Arabia Client: National Water Company (NWC) The project lowers the surface-water table caused by uncontrolled wastewater discharge and addresses the environmental and public-health impacts of groundwater contamination, while extending sewerage service to the Al-Taawun, Al-Hamra, Ibn Sina, Al-Fawaziyah Industrial and Al-Sawari districts and further areas of Al-Khobar, in line with the National Water Company strategy, the Supply and Demand Document and Saudi Vision 2030. The scope comprises 95,867 linear metres of gravity sewers in diameters from 200 mm to 1,100 mm, 21,273 linear metres of force mains in diameters from 150 mm to 900 mm, the construction of four new pumping stations and the rehabilitation of six existing pumping stations. View project East Hidd Water Pumping Station (EPC1) Completed Water & Sewerage East Hidd Water Pumping Station (EPC1) East Hidd, Kingdom of Bahrain Client: Ministry of Housing, Bahrain (MOH) Construction of the East Hidd water distribution station on a 6,200 m² site, comprising a semi-buried concrete reservoir of no less than two million gallons and an automated pumping station with variable-speed pumps rated at five million gallons per day, together with all site and utility works, delivered as an EPC contract. View project Construction of (9) GLS Storage Tanks for Potable Water in Tabuk City Completed Water & Sewerage Construction of (9) GLS Storage Tanks for Potable Water in Tabuk City Tabuk Client: Ministry of Environment, Water & Agriculture (MEWA) Design, supply, construction and testing of nine glass-fused-to-steel (GLS) potable water storage tanks in Tabuk, with the associated electromechanical works. View project
View All Projects
Next Project Framework Agreement for Infrastructure Works with Roshn Group Company