Project Overview
Bin Omairah’s scope of works under this Project is to perform detailed engineering and design, procure, supply and deliver all equipment and materials to the Worksite, construct, install, test, commission, and put into service the 115 Kv Under Ground cable circuits along the power supply lines to Dammam Housing Projects.
- No. Of Circuits: 14
- Route Length: 73 KM
- U/G Cable Length: 219 KM
- Fiber Optic Cable Length: 42 KM
- Excavation Work: 160,000 M3
- Backfilling Work: 147,000 M3
- Asphalting Work: 99,000 M2
- HDD ( Horizontal Directional Drilling): 1136 ML
- Insulated Joints: 687 Joint
- Road constriction Length: 6 KM
- Road construction Filling : 94,918 M3
- Road construction Cutting : 23,901 M3
- Route below ARAMCO Pipe Lines: 90 ML
- Excavation QTY: 22,308 M3
- Backfilling Filling Work: 21,438 M3
- Concrete Work Below Pipes: 850 M3
Client
- Saudi Electricity Company (SEC)