Project Overview

Bin Omairah’s scope of works under this Project is to perform detailed engineering and design, procure, supply and deliver all materials and equipment to Worksite, construct, install, test commission and put into service:

 Project Portion I:
Connection of Ashbailyah BSP S/S 9038 with 132kV Riyadh Network with S/S 8142.

Project Portion II:
Connection of Ashbailyah BSP S/S 9038 with 132kV Riyadh Network with S/S 9017.

  • No. Of Circuits: 14 CCT
  • Route Length: 46 km
  • 132 kv U/G Cable Length: 138 km
  • Fiber Optics Cable Length: 46 km
  • HDD: 2.3 km
  • No. of Districts: 6
  • No. of Substations: 13
  • Insulated Joints: 333 pcs
  • GIS Termination: 39 pcs
  • Outdoor Termination: 12 pcs
  • Asphalting Quantity: 138,000 Sqm

Client

  • Saudi Electricity Company (SEC)