Project Overview
Construction of a new 132/13.8kV indoor GIS type Substation, arranged in a double-bus-single breaker configuration in AL-NADA area Riyadh. The Scope of works includes associated works in remote end substation # 9008. The substation shall be equipped with Substation Automation System (SAS) and will be remotely controlled from the SEC Power Control Center (PCC) through a Telecommunication system and gateway
- 67 MVA: 3
- GIS: 10
- SWGR: 48
Client
- Saudi Electricity Company (SEC)