• image

Project Overview

Construction of a new 132/13.8kV indoor GIS type Substation, arranged in a double-bus-single breaker configuration in NORTH   ALMORABA area Riyadh. The Scope of works includes associated works in remote end Substations # 9052 & 8102 . The  substation  shall be equipped with Substation Automation System (SAS) and will be remotely controlled from the SEC Power Control Center (PCC) through a Telecommunication system and gateway

  • 67 MVA: 3
  • GIS: 10
  • SWGR: 48

Client

  • Saudi Electricity Company (SEC)