Project Overview

Bin Omairah executed the most strategic and highly rush turnkey contract for the design, manufacture, delivery, installation, jointing, termination, testing, commissioning and put into service of the connections of New AsSafa BSP Substation # 9014 to integrate it with 132Kv Network. This $102 million turnkey contract awarded to Bin Omairah by Saudi Electricity Co. (SEC) is considered the biggest ever Underground Transmission Power Lines Project at 132Kv voltage level in Central Operating Area (COA). This Project comprising laying of 304 Km of 132Kv Underground Cables in the most congested area in the heart of the old Riyadh City Centre “Al Batha Souq Area” to configure 23 circuits with total route length of 99.80 Km including 5.39 Km Horizontal Directional Drilling (HDD).

  • No. Of Circuits: 23 CCT
  • Route Length: 103 km
  • 132 kv U/G Cable Length: 308 km
  • Fiber Optics Cable Length: 107 km
  • HDD: 4.32 km
  • No. of Districts: 12
  • No. of Substations: 12
  • Insulated Joints: 738 pcs
  • GIS Termination: 102 pcs
  • Outdoor Termination: 6 pcs
  • Asphalting Quantity: 299,500 Sqm

Client

  • Saudi Electricity Company (SEC)